Large architectural picture window framing desert landscaping

New-home installation

Windows belong in the architectural conversation early.

Coordinate openings, proportions, frame materials, glass, finishes, and installation details before the project is forced into last-minute compromises.

Request a free estimate

For homeowners and builders

One package, considered as part of the home.

New construction creates opportunities replacement work does not: larger openings, aligned sightlines, integrated patio systems, consistent finish schedules, and installation details coordinated with framing and weatherproofing.

  • Window and door schedule review
  • Material and collection comparison
  • Glass packages by orientation and room
  • Large-opening and indoor-outdoor systems
  • Final field measurement and order verification
Completed covered patio with coordinated windows and outdoor living space

Project rhythm

Decide before the walls decide for you.

Early coordination protects dimensions, egress, safety-glazing locations, structural needs, finish continuity, and lead-time planning. Final product availability and code requirements are confirmed for the specific project.

01

Plan

Review drawings, opening goals, style, materials, room use, exposure, and performance priorities.

Explore products
02

Specify

Narrow collections, operating types, glass, colors, hardware, grids, sill conditions, and patio systems.

Compare brands
03

Verify and install

Confirm field conditions, approved documents, order details, delivery access, waterproofing boundaries, and installation scope.

See the process

Coordination before release

Every trade needs the same version of the opening.

The product order, framing, structural design, waterproofing, finish floors, exterior finish, electrical needs, delivery path, and installation plan must agree.

  • Approved window and door schedule
  • Rough openings, headers, jamb support, and movement limits
  • Glass, egress, safety-glazing, and performance requirements
  • Sill, pan, drainage, flashing, and waterproofing details
  • Interior and exterior finish transitions
  • Delivery, storage, protection, installation, and service access

New-home installation FAQs

Coordinate the decisions before they become changes.

How early should windows and doors be selected for a new home?

Begin during design development, before framing, structural, waterproofing, finish-floor, and exterior details become difficult to change. Large openings, pockets, corners, specialty shapes, and recessed sills need the earliest coordination.

Can one package include multiple materials or brands?

Yes, when the product and installation requirements support it. The schedule should still coordinate sightlines, colors, glass appearance, grids, hardware, interior finish, exterior finish, warranties, and service responsibility.

Who confirms structure and code requirements?

The project team must coordinate current code, egress, safety glazing, engineering, header movement, rough openings, waterproofing, and manufacturer limits. The final product and installation plan should match the approved project documents.

What should be reviewed before the order is released?

Confirm the opening schedule, exact manufacturer and series, dimensions, operation, handing, glass, finish, hardware, screens, sill or threshold, ratings, drawings, installation details, delivery plan, and written warranty.

Start with a clearer plan

Bring the window plan into focus.

We will help compare the systems, identify the opening-specific questions, and coordinate a written path from plans to installation.